27th Street Bridge
Call the hotline to hear the latest traffic impact information: 970-618-5379. View the latest ConeZone updates under the news section on the City’s homepage (scroll down).
Ongoing Impacts
Whenever possible, crews are limiting work with traffic impacts to off peak hours. However, due to the dynamic nature of the construction activities and site constraints, intermittent lane closures on the bridge and S. Grand Ave. may be required during peak times.
Motorists should expect ongoing holds and bridge lane closures during off peak hours (before 7AM, between 8:30 AM-4:30 PM, and after 6 PM). Night work will occur frequently and is noticed via ConeZone email updates.
Construction may also occur on Saturdays and Sundays, 8 AM to 6 PM, as needed.
Do not block intersections or the roundabout and follow flagger instructions.
Call the hotline to hear the latest traffic impact information: 970-618-5379.
Sign up here for News and Updates
27thStreetBridge@gmail.com
Phone: 970-618-5379 (call or text)
Activity | Timeline |
---|---|
Soil Nail Walls for Abutment | Completed |
Micropile Construction | Completed |
Pedestrian Bridge Set | Completed |
Traffic Bridge Closure for Slide of New Bridge | Completed |
In-Water Dates per Specifications | Completed |
Roundabout Construction | Completed |
Pier Removal from Roaring Fork River | Completed |
Aesthetic Applications | Ongoing |
Punchlist Work | Ongoing |
Project Significant Completion | February 2020 |
Ribbon Cutting Ceremony | February 12, 2020 at 2 PM |
Tips for Motorists
- Plan extra travel time through the area especially during peak times. Delays have ranged between approximately 5 and 25 minutes and are intermittent in nature.
- Do not block the roundabout and follow flagger instructions. This helps to keep traffic flowing.
- Use alternate routes (CO-82). Midland Avenue should be used for local traffic only.
- Walk, bike and carpool whenever possible. The fewer cars trying to get through the area will mean shorter delays.
- Scheduled impacts are communicated via the ConeZone email update, city Facebook, city Twitter and the project phone. Tune in to your platform of choice to see the latest information.
- All work is weather dependent and subject to change based on conditions encountered.
Project History
City Council approved the 27th Street Bridge project design services during construction and construction management contract at the regular August 2, 2018 City Council meeting. Council awarded the bridge design services during construction contract to Wood and construction management contract to HDR.
City of Glenwood Springs officials held a ceremonial groundbreaking on November 14, 2018. Construction is set to begin in early 2019. Once construction begins, this project is currently anticipated to last for 12-18 months.
Construction will implement a bridge slide and minimize impacts to traffic, pedestrians, utilities, and river users. The new vehicle bridge will be built adjacent to the existing bridge and then slid into place. A new and separate pedestrian bridge also will be built, and all bridge piers will be removed from the Roaring Fork River.
The City received a $950,000 grant from the Colorado Department of Local Affairs and a $500,000 grant from the Garfield County Federal Mineral Lease District for the Construction of the 27th Street Bridge. Total grant funding for the replacement of this bridge is $3.18 million with almost $2.6 remaining for construction. As of March 2018, $620,828 of the Off-System Bridge funding had been utilized in the design with $1.1 million remaining for construction.
Ninety percent construction plans are available at cogs.us/DocumentCenter/View/3673
A PDF of design team AMEC Foster Wheeler's presentation from Nov. 16, 2016 is available at cogs.us/DocumentCenter/View/1528
- What is the project schedule?
- What traffic impacts will I see as a commuter?
- How will this impact river use on the Roaring Fork?
- Why isn't South Bridge being built before the 27th Street Bridge replacement?
- How much traffic goes over the bridge?
- How much will this project cost?
- What is a pier?
- What is an abutment?
- What is a micropile?
- What is a soil nail?
-
City of Glenwood Springs April 6, 2021 Unofficial Regular Municipal Election Results
-
Glenwood Springs Offers Landfill Vouchers for 2021 Spring Cleanup
The City of Glenwood Springs is offering landfill vouchers for the 2021 Spring Cleanup. This is a proactive measure to limit employee-resident interactions to slow the potential spread, impacts, and damage of COVID-19. Read on... -
City of Glenwood Springs Reviews Increasing Water Usage Rates Related to Infrastructure Needs
Facing critical infrastructure needs and capital costs over the next 10 years, City Council is reviewing and will decide on water and wastewater rate increases over the next 10 years. City Council anticipates making a decision in the Spring of 2021. Read on...